Studying the local climate and gathering data is fundamental to site selection. Using the monitoring equipment ‘Warkino’, we analyze the weather conditions and assess the presence and frequency of fog, rain and dew in the area. Once the site has been identified as suitable for Warka, a test prototype of 1 sqm devices will be installed and monitored for 6 months. The site should have sufficient space available and free for the construction of the Warka.